China Harbour Signs Contract for Tanzania Waterway Dredging Project

02/Mar/2021

On February 17, China Harbor Corporation successfully signed a contract for the dredging project of the Dar es Salaam port basin and waterway in Tanzania. The project period is 30 months. The main work content includes the salvage of the sunken ship, the dredging of the basin and waterway(silt curtains and dredgers), and the procurement and installation of navigation aids. The total amount of dredging is about 8.4 million cubic meters.



<< Back