Jiulongpo: The Yangtze River Channel Regulation Project entered the final stage

07/May/2020
Recently, the reporter learned from Chongqing Engineering Bureau that after four years of rectification, the Jiuzhao section of the Yangtze River Channel has now entered the final stage, and the entire project is expected to be completed in mid-May. At that time, the level of the original channel will be upgraded from level III to level I, which can effectively improve the traffic conditions of the Yangtze River channel. It dispatched the dredging ships with the dredgers and silt curtains for waterways dredging.



<< Back