The 2020 comprehensive water emergency drill in the Badong section

19/Nov/2020

"Maritime, maritime affairs, when my ship descended to the waters of Tiandeng Bay, I suddenly encountered a boulder on the mountain and fell, and the ship accidentally hit the reef during the evasion process, then caused the hull to break into the cabin and enter the water. Asking for help!" At 9 am on November 5th, In 2020, a comprehensive water emergency drill on the Badong section of the Three Gorges Reservoir of the Yangtze River will be held in the waters of Badong Nanmu Garden.
 
After receiving the police, the Badong Maritime Department immediately activated the emergency plan for landslides and implemented temporary traffic control on the waters. The "Hai Xun 12290" ship sailed to the waters where the incident occurred, and the distressed ship "Huanghuang 3168" was directed to the Yangjiapeng waters for emergency response. During the beach washing process, a crew member accidentally fell into the water, and the beach washing caused a lot of oil pollution at the stern of the ship. "Hai Xun 12290" ship immediately rescued the people who fell into the water, and immediately activated the ship's oil spill emergency response plan, and mobilized "Badong Environmental Protection No. 1" ship and other ships to the scene with anti-pollution equipment for disposal by using oil booms and oil absorbent pads. At the same time, experts from the land disaster department were invited to conduct on-site exploration of the landslide body waters. After the expert judged on the spot,the landslide body was stabilized, the channel department immediately carried out the channel sweep survey on the water area where the boulder fell. After scanning, the navigable conditions of the waters where the boulder falls are good. At 10:30, the Badang Marine Department lifted the temporary traffic control. "Hai Xun 12290" ship organized other rescue ships to tow the "Huang Xian 3168" ship, which had undergone emergency measures such as plugging and drainage and then took to safe waters. At 10:40, the exercise was ended.



<< Back