Tangshan Downtown river channel dredging project was started
09/Nov/2018
On October 30, Tangshan Downtown river channel dredging project was officially started. The project is a key construction project of the “Three-Year Action Plan for the Whole Area Governance of Qingshui Runcheng” and it is an important part of the implementation plan of “Building Ecological Tangshan and Realizing Green Development” proposed by the Municipal Party Committee and the Municipal Government.
The construction scope of the project involves 9 river systems, such as Douhe River, Qinglong River, Ligezhuang River, Longwangmiao River and Shiliu River in the main urban area of our city, with 82.5 kilometers dredging rivers and comprehensive river management. The construction of the project is expected to be completed by the end of January 2019.
The implementation of the project aims to take advantage of the favorable construction timing of this winter and spring water conservancy project, fully promote the river siltation removal, reduce the impact of endogenous pollution, and ensure the steady improvement of urban rivers and lakes. At the same time, it solves the emergency ecological water source of small rivers around the main urban area, ensures ecological base flow, restores riverbed water ecosystem, improves self-purification capacity and repair capacity, and effectively improves urban and rural water ecological environment. It will deployed silt curtains for controlling the silt and waste.