Donggang Petrochemical Terminal was occurred oil spill

22/Feb/2019
At 16:00, the “Tiantong 1” tanker was berthed at the dock of Donggang Petrochemical Terminal; At about 19:20 pm, it began to carry out the loading of industrial cracking C9 from the oil pipeline of Donggang Petrochemical Terminal; in the early morning of next day at 0:51, the pipeline was jumped. At 1:13, , the operators of Donggang Petrochemical Terminal found that industrial cracking C9chemicals leaked during the loading process. The on-site staff immediately took measures to stop the pump and shut off the valve, and entrusted qualified units to quickly go to the terminal for oil recovery.
  
At 1:23 in the morning, the oil stopped leaking; at 2 o'clock in the morning, the disposal unit rushed to the dock to recover the oil, it was deployed oil booms and oil absorbent pads; at 4:30 in the morning, the cleaning operations in the oil booms were basically finished. However, part of the slop oil moved to the adjacent Xiaocuo Sea, and the air in some parts of Quangang had a pungent smell. After the incident, the local government immediately deployed, and the marine department took the lead in organizing the disposal of oil spills at the sea and the treatment of polluted aquaculture to ensure the safety of marine food; the environmental protection department strengthened the monitoring of atmospheric environmental quality.



<< Back