Maoming City maritime oil spill emergency drill was successfully held

18/Oct/2019
Recently, Maoming Maritime Bureau and Maoming Petrochemical Company held 2019 maritime oil spill comprehensive emergency drill.
 
In the waters near Bohe Xingang District, with the ringing of the alarm bell, the director of the 0952 ship commander, Chen Luxun, announced that the 2019 Maoming City maritime oil spill comprehensive emergency rescue drill officially began! This drill was simulated when the oil was unloaded, the floating hose head was broken and leaked crude oil, causing environmental pollution. The drill was included the contents of marine oil spill control and removal.
 
At 10:01 am, the single-point operator found that the floating hose 541 tube head was overflown crude oil, he immediately reported the mooring length, mooring long to the port branch dispatch report, and reported to the Bohe Maritime Department, then Bohe Maritime Department reported to Maoming Maritime Bureau Command Center, after the Maoming Maritime Bureau received the report, they quickly launched the Maoming Port Prevention and Control Plan for Ship Pollution, and the Maoming Petrochemical Port Division handled the emergency disposal according to the plan.
 
The crew of the offshore operations team responded quickly and carried out emergency operations in accordance with their respective emergency duties. Three personnel in the single-point on-site emergency response team of the port branch arrived at the single-point pontoon by Huijiao No.2 boat, entered the site of the plugging leak, and raced against the float to close the valves to confirm the oil leakage.
 
During the unloading process of cutting, the professional survey drone coordinated by the Maoming Maritime Bureau Command Center also took off urgently, always starred at the single-point oil spill area, and timely feedback the situation on the spot. At the same time, the monitoring ship dispatched by the chief was evaluated and monitored the oil spill, and reported the collected oil spill location, estimated area, oil spill predicted drift path to the command center, and Shenghua No. 2 ship arrived at the designated location according to the instructions. The oil skimmer was deployed to collect the oil from the surface of the sea. In order to prevent the expansion of the oil spill area, the command center also dispatched the Petrochemical No. 7 ship to deployed oil booms under the assistance of Huijiao No. 2 ship.
 
After more than one hour of joint rescue, the oil spill on the sea surface was effectively controlled and recovered in time. The comprehensive maritime emergency drill was successfully completed.


 

<< Back