Meixi River waters pollution emergency drill

08/Jun/2020

On June 2, Shantou Maritime Bureau cooperated with some departments to carry out the Meixi River waters pollution emergency drill with the theme of "Beautiful Hanjiang, I am the Guardian".
"Shantou Maritime Bureau, I am the Meixi River Bridge Construction Project Department. I found a lot of oil pollution on the river surface near the operating platform and requested support!" After receiving the alarm, the maritime, water affairs, environmental protection, public security and other departments immediately started the water pollution emergency plan and emergency response, the maritime department and the speedboat team of the public security rushed to the scene to strengthen the on-site security alert and set up prevention and control areas on the site to prevent unrelated ships and personnel from entering the oil pollution site.

The maritime personnel immediately organized the boat and personnel to take oil and water samples and started the investigation as soon as they arrived at the scene. At the same time, they organized the navigation mark official ships and water decontamination ships that arrived at the scene to clean up the "oil pollution".

Beacon ships use oil booms to surround "oil pollution" for preventing diffusion and reducing losses caused by pollution. The water decontamination vessel immediately threw oil absorbent pads to clean the surface. Various clean-up operations are being carried out in an orderly and tense and orderly manner. Finally, the oil absorbent pads has been salvaged to the shore after absobrbing, the river surface has been effectively cleaned, and the emergency drill has been successfully concluded.



<< Back