Yumen Rive dredging work was carried out in an orderly manner

24/May/2019

On May 14th, the Yumen River dredging work in the provincial capital was carried out in an orderly manner to ensure the smooth flow of rivers, eliminate black and odorous water bodies, and improve flood control standards. It was firstly used silt curtains and excavator to control and clean the silt. The beauty of the water and clear green will become a reality step by step.



<< Back