Zuocha dredging project resumed the dredging in the Jiushijiuxi Neikeng section
13/Apr/2020
Yesterday, the reporter learned from the Neikeng town in Jinjiang that recently, the construction unit for the dredging works on the Zuocha River has done a good job in epidemic prevention and control in accordance with the resumption of the water conservancy industry. The project has now resumed construction.
On the morning of the same day, the reporter came to the Shenzhen village section of Jiushijiuxi Neiken section, and the team leader of the project epidemic prevention management team registered the construction workers and took their temperature. Subsequently, construction workers drove large machinery and used silt curtains and started dredging the river. A day's work was begun.
It is reported that Jiushijiuxi Neikeng section, as an important backbone river in Jinjiang City, is divided into two sides, with a total length of 10.24 kilometers and a drainage area of 53.5 square kilometers. In recent years, due to the rapid growth of river water lily, the sediment has been seriously affected, which not only affects the river water environment, but also causes hidden dangers during the flood season. In order to further improve the river environment, Neikeng Town decided to implement a dredging project on the left side of the Jiushijiuxi Neikeng Section, with a length of 4.8 kilometers.