Maintenance and dredging of the Jiujiang Waterway of the Yangtze River officially started

07/Sep/2020

Affected by this year’s flood conditions, the flow and water level of the Jiujiang section of the Yangtze River continued to operate at a high level, and large-scale siltation occurred in the upper and shallow areas. The fall of the water level after the flood will affect the navigation and maintenance of the waterway. They will carry out dredging work in advance by using silt curtains and dredgers.



<< Back