In order to ensure that the life and property safety threats of the people on both sides of the strait, before the flood season, the section from the cable bridge to Feishaguan in Qiangfeng Village, Miansi Town, is working hard to carry out river dredging.
From the cable bridge from Feishaguan of Qiangfeng Village in Mianlai Town, a large number of congested bodies entered the Minjiang River due to the "8.20" large debris flow disaster, raising the river bed, and threatening the lives and property of people on both sides of the strait as the flood season approaches. The dredging mileage of this section of the river is 4.145 kilometers, involving more than 1.4 million square meters.It will used silt curtains and dredgers. After the completion of the dredging work, the threat to the lives and property of the people on both sides of the strait will be effectively reduced.