The along waterway in the Wusongkou Internaition Cruise Terminal was started dredging
15/Jan/2020
The along waterway in the Wusongkou Internaition Cruise Terminal has always been a “blocking point” for cruise ships to berth from the mooring waters. The water depth was only about 6 meters, and the slewing space by the mooring dock was limited. If the captain drove a little carelessly, the cruise ship easily will run aground. After the dredging is finished, the water depth here will increase to about 11 meters, which will facilitate large international cruise ships to dock at the berth and improve the punctuality and safety of the cruise ships. It will use silt curtains and excavator. Baoshan Maritime Bureau cruise port and sea patrol law enforcement officials introduced that after the blocking point is cleared, the cruise ships will be more convenient to rely on.