Urban area was carried out Sanjiang River dredging project

07/Feb/2020
A few days ago, with the order of the on-site commanders, a row of dredging and dredging engineering boats and engineering vehicles gathered in Shuikou Village, Xinshao Town, Qijiang District started and carried out the operation, which lasted for 5 months.
 
The relevant person in charge of the Municipal Water Affairs Bureau said that the implementation of the river dredging project in the urban area includes the following purposes: First, the need for flood prevention, by removing and dredging the silt and obstacles in the river(by using silt curtains and dredger), it will further improve the urban disaster prevention and mitigation capacity; Second, It is necessary to improve the urban water environment and living environment, and to improve the urban water environment and urban environment inadequate conditions by cleaning up weeds on the river banks and illegal vegetable fields on the river beach. Third, it is purposed to improve the navigation of ships.



<< Back