Nanjiang Port maritime oil spill emergency drill was held in the frontier and Gangchi Waters of 300,000-ton Tianjin Shihua crude Oil Wharf.
This was the first time in Tianjin area which was carried out maritime spill emergency drill in 300,000 tons of super large oil tankers and terminals. The participating "Yuanyanghu" ship has 330 meters length, 60 meters wide, 29.7 meters depth and 21.5 meters full load draft, it can be loaded with 297,000 tons crude oil. The theme of the drill was "paying attention to the maritime oil spill emergency and constructing green and safety Tianjin", it was held by Tianjin Maritime Search and Rescue Center, Nanjiang Maritime Bureau was the organizer, the participating units was included Traffic Management Center of Tianjin Maritime Bureau, the Dongjiang Maritime Bureau and Nanjiang Port Joint Meeting system related member units, there was a total of 9 vessels, 7 vehicles and 10 members from the Guo Mingyi caring team of Tianjin Maritime Search and Rescue volunteer unit participated in the drill.
After the accident, Nanjiang Maritime Bureau was immediately contacted the Traffic control center of the incident waters, and commanded the most recent "Sea Patrol No.15023" tanker to the scene to organize ship evacuation and on-site vigilance, at the same time they reported the accident situation to commander.
Danger is an order, Tianjin Nanjiang Maritime Bureau was immediately launched the emergency plan according to the situation, in the framework of the Nanjiang port maritime emergency linkage mechanism, they quickly deployed the maritime, public security, medical, fire, tug, professional plugging team, professional cleaning team and the Guo Mingyi team of Tianjin Maritime Rescue Volunteer unit and other emergency rescue forces to organize the emergency work in an all-out effort.
After received the order, "Sea Patrol No.15023" ship was immediately taken into the command, and grasped the information: “Yuanyanghu" ship has been emergency closed the oil pump and export valves, and transferred the injured crew to the safe area. At present, the ship deck has a large amount of oil, oil tankers have started emergency plans. They firstly used oil booms for controlling the oil, and then used oil absorbent mats for oil absorbing, finally they carried out residual oil cleaning by using oil skimmers.
The Shihua Wharf was immediately evacuated the field personnel, and began to set up isolation, build rescue green channel and arrange personnel with cleaning equipment to dock area assembly.
With the injured crew has been delivered to the Port hospital in the “Yuanyanghu” ship, the wheel hull hole was successfully plugged, the sea oil spill was cleared, the water quality was conformed to the standard according monitoring, the accident emergency processing task was successfully completed.