The Yangtze River Liantuo Section Waterway carried out dredging operations

10/Jun/2019
On May 26, the large-scale construction vessel was dredged in the waters of the Liantuo section of the Letian River in Yiling District, Yichang City, Hubei Province.
 
The Yangtze River Liantuo section waterway dredging project is one of the waterway system remediation projects between the Three Gorges Dam and the Gezhouba these “two dams”. The project mainly removes the underwater obstructed reefs on both sides of the coastline and removes the lower riverbed of the left bank. And it was also used silt curtains for controlling the pollution firstly. The reef-removing reef is used to deepen the river section of the project, and the related navigation and hydrological facilities are built.

 

<< Back