Gaoyi Yuanshi Management Office held a hazardous chemicals leakage emergency disposal drill

20/Sep/2019
On September 4, 2019, Gaoyi Yuanshi Management Office organized all employees, emergency teams, civil construction and maintenance units, resident teams, engineering inspections, security detachments, police departments, and mechanical and electrical information maintenance units to carry out hazardous chemicals leakage emergency disposal drill.
 
The drill was simulated a traffic accident of a fully loaded color steel house truch on the Nanxing Guoqiao Highway Bridge across the main canal, causing the fuel tank to rupture, diesel leaking, and pollutants flew along the bridge joint into the channel inspection road and the inner slope lining, plates and water bodies trigger water pollution incidents. On the site, the pollutant patrol roads and inner lining linings was disposed, bridge deck was treated, oil booms and oil absorbent booms were deployed and oil absorbent pads were thrown. Then the reporting procedures and opening and closing of the sluice gates were deduced in the room.
 
Through this drill, the participants have an intuitive and profound understanding of the emergency disposal process and the pre-treatment measures, and improved the emergency response and advanced processing capabilities of all staffs of the management office, emergency teams, engineering inspections, and security units.


 

<< Back