On August 17, in the Xinfengqiao section of the Sanya River, a number of river dredging engineering ships(including silt curtains) were carrying out channel dredging operations.
It is reported that in response to the current accumulation of silt in the Sanya River channel, the relevant departments of Sanya City organized the dredging and remediation of the channel section of the Sanya River City to improve the safe navigation capacity of the channel, ensure the development of Sanya inland river tourism projects, and promote the transformation and upgrading of tourism products.